by PeterWebAdmin | Dec 18, 2024 | Consultancy Planning
Infinite have been working with Willis Asset Management to bring renewable energy to their headquarters at Aviation House in Bridgend. A Feasibility Study was undertaken and recommended that a mixed-technology development, integrating solar and wind would be suitable...
by PeterWebAdmin | Dec 10, 2024 | Mobile Turbines
In 2023, Infinite Renewables was approached by Octopus Energy Generation to supply and deliver a temporary installation of a 45kW Bestwatt wind turbine, also known as ‘Gusty Spinfield’, for Glastonbury Festival. At the end of the 2023 festival, Gusty Spinfield was...
by PeterWebAdmin | Dec 10, 2024 | Consultancy Planning
In 2023, Infinite was approached by the owner of Rhosygilwen Mansion, a music and wedding venue, in Pembrokeshire. The Mansion House was heated using a ground source heat pump, with electricity generated by an existing solar farm. However, there was a mismatch from...
by PeterWebAdmin | Dec 8, 2024 | Turbine Removal & Repowering
A redundant 20kW Gazelle turbine at Montagne Jeunesse premises in Port Talbot was removed by Infinite in July 2024. The component parts of the redundant turbine were recycled and the site will be re-powered by Infinite once the new tenants are in situ at the premises....
by PeterWebAdmin | Dec 7, 2024 | EV Renewable Charging Stations
Infinite Renewables developed the Electric Vehicle (EV) charging station and connected it to the Tafarnaubach Wind Turbine – an EWT 500kW machine. The EV station houses the first wind powered, ultra rapid EV charging point in the UK. Located in Tafarnaubach Industrial...